Blog · Government Schemes
PM Kusum Yojana: Complete Guide to Solar Pump Subsidy 2026
Get 90% subsidy on solar pump installation under PM-KUSUM scheme. Learn eligibility, application process, and benefits for farmers.

What is PM-KUSUM Yojana?
PM-KUSUM (Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan) is a landmark scheme launched by the Ministry of New and Renewable Energy (MNRE) to provide clean energy solutions to farmers. The scheme aims to add 30,800 MW of solar capacity by 2026 through three components.
This scheme enables farmers to reduce diesel dependency, lower irrigation costs, and earn additional income through solar power generation. With financial assistance of up to 90%, PM-KUSUM makes solar technology accessible to all farmers.
Three Components of PM-KUSUM
Component A: 10,000 MW Grid-Connected Solar Power Plants
Set up 2 MW decentralized grid-connected solar power plants on barren or fallow land. Farmers can earn by selling power to DISCOMs at feed-in tariff rates.
Component B: 20 Lakh Standalone Solar Pumps
Install standalone solar water pumps (up to 7.5 HP) replacing diesel pumps. Get 90% financial assistance - 60% subsidy + 30% loan. Pay only 10%.
Most Popular Component for Tamil Nadu Farmers
Component C: Solarization of 15 Lakh Grid-Connected Pumps
Convert existing electric pumps to solar. Sell surplus power back to the grid through net metering and earn extra income.
Financial Assistance Breakdown
| Component | Central Subsidy | State Subsidy | Bank Loan | Farmer Share |
|---|---|---|---|---|
| Component B (Standalone) | 30% | 30% | 30% | 10% |
| Component C (Grid-Connected) | 30% | 30% | 30% | 10% |
Eligibility Criteria
- Individual farmers with agricultural land
- Farmer Producer Organizations (FPOs)
- Cooperatives of farmers
- Panchayats and village-level institutions
- Farmer groups registered under relevant acts
- Valid land ownership or lease documents required
- Bank account for subsidy disbursement
- Aadhaar card for identity verification
How to Apply for PM-KUSUM Scheme
- Visit Official Portal: Go to the MNRE PM-KUSUM portal or your state renewable energy agency website (TEDA for Tamil Nadu).
- Registration: Register with basic details - name, mobile number, Aadhaar, and land details.
- Component Selection: Choose Component B for standalone solar pump or Component C for grid-connected solarization.
- Document Upload: Upload land records, Aadhaar, bank passbook, passport-size photo, and electricity bill (for Component C).
- Technical Feasibility: Technical team will assess site suitability and water availability.
- Vendor Selection: Choose from empaneled vendors or let the agency assign one through tendering.
- Installation: Approved vendor installs solar pump within 30-45 days of work order.
- Subsidy Disbursement: After inspection and commissioning, subsidy is credited directly to farmer's account.
Benefits of PM-KUSUM Solar Pumps
- 90% Financial Assistance: Only 10% investment from farmer
- Zero Electricity Bills: Free power for irrigation for 25+ years
- Diesel-Free Farming: No fuel costs, price volatility, or refueling hassles
- Reliable Water Supply: Pump water even during grid outages or load shedding
- Low Maintenance: Minimal upkeep compared to diesel pumps
- Earn Extra Income: Sell surplus solar power to grid (Component C)
- Eco-Friendly: Reduce carbon footprint and contribute to clean energy
- Increases Land Value: Solar infrastructure enhances property value
Cost and Savings Example (5 HP Solar Pump)
Total System Cost
₹4,00,000
Government Subsidy (60%)
₹2,40,000
Bank Loan (30%)
₹1,20,000
Your Investment (10%)
₹40,000
Monthly Diesel Savings
₹12,000 - ₹18,000
Assuming 6-8 hours daily operation
Documents Required
- Aadhaar card of applicant
- Land ownership documents (Patta, Chitta)
- Bank account details and cancelled cheque
- Passport-size photograph
- Mobile number registered with Aadhaar
- Electricity connection proof (for Component C)
- Caste certificate (if applicable for additional benefits)
- Income certificate (for priority allocation)
Why Choose Abi Green for PM-KUSUM Installation
- MNRE Empaneled Vendor: Approved installer for PM-KUSUM scheme in Tamil Nadu
- End-to-End Assistance: From application to commissioning, we handle everything
- Documentation Support: Complete help with paperwork and subsidy claims
- Quality Equipment: Tier-1 solar panels and ISI-certified pumps
- Quick Installation: Commissioning within 30-45 days
- 5-Year Warranty: Comprehensive warranty on pumps and panels (25 years on panels)
- Free Site Survey: Technical assessment at no cost
- Post-Installation Support: AMC packages and responsive service